Our People Our Buildings Our Neighborhood About Us Contact Us
         
   
 
     
     
 

Building Layout

Our Building 1, 2, and 3 designations may seem to be "backwards" compared to the order in which one arrives to them, but it was based on the order of construction.  Building 1 was the first to be built, 2 was second, and 3 was third.
 
     
  Entering the swimming pool area via the walkway and gate between Buildings 1 and 2, one finds the office located in the first ground level cabana on Building 1.  
     
   
     
  When you exit the elevator at the P1 level, the easy way to remember which way to exit is this: the "short end" of the hallway goes toward the trash room, and the "long end" goes toward the "light at the end of the tunnel" - meaning the open garage door side and the swimming pool.  
     
 

This schematic sketch shows the layout at the P1 elevator hallway.  Turn toward the closest door to go toward the trash room.  Turn toward the farthest door to go to the pool or to go toward the large open garage entryway. 

The trash room side is also the street side.  Of course, the pool side is also the marina or water side.

If you take the trash chute exit stairs down to the garage level, the exit door goes out to the garage roof on the pool side.  There are two stairs to the ground level, one on each end of the building, or you can use the cabana elevator.